Monday, 9 March 2015

A Finish-Along Finish - Posy Baby Quilt

Last June Nick's cousin had a baby girl - as soon as I found out (on holiday in Devon) I knew I wanted to make a quilt for her, and as I'd been looking at Lynne's really effective quilt for Dashwood Studios on instagram as I found out I got thinking about a quilt using squares and sashing.

Once home I raided my stash and found a charm pack and a mini charm pack in Aneela Hoey's Posy range which was just perfect for this quilt - it's such a gorgeous, gentle, girly range - perfect for a baby quilt. I combined it with some Kona Snow (all fabrics from Simply Solids) and set about working out the quilt design and what pieces I needed to cut from the Kona:




Then I started sewing, firstly at Leeds MQG after we'd done our Siblings Together blocks last June:




Then at my temporary home, my dressing table in our dining room, in the middle of our bedroom redecoration: 




By the time I did my first Finish-Along list on 14th July the middle bit of the quilt and the first borders were on, and by the following week I had a finished quilt top, about 48 inches square:




I selected Ikea Rosalie in pink with red dots from the backing and tracked down some Posy yardage for the binding, did I finish it? no of course I didn't.... It sat around, took a trip to Southwold and back in October but never left the bag (I did finish 2 other quilts that week though) and sat at home waiting to be quilted, I thought I can't gift this now, it's far too late. 

Then in January we were invited to the baby's christening, which was yesterday, so I decided to finish it for that. Only being me I only pulled it out on Wednesday evening. Nick wasn't in the mood to help but I got it basted eventually and quilted very quickly on my new machine:




All quilted in Aurifil 2423, a lovely baby pink that melted into both the front and back of the quilt. 




After Guides on Thursday I made the binding but I was way too tired to try attaching it, so left that for my flexi day on Friday. I got it done, after several attempts, on my machine, and I'm pretty pleased with the result, but too late to wash.




After double checking with the lovely people of instagram, when I got my parents house on Saturday afternoon (they live about 35 minutes away from Nick's cousin and the christening location so we stayed with them) I washed and tumble dried the quilt, the tumble drying bit flooded the kitchen floor but my parents were brilliant, didn't complain, get stressed, or let us mop it up ourselves. 

So here it is - one finished quilt: Nick was rushing to get ready so no great photos, my mum didn't seem to get the 'hold it over your face' bit but never mind. 




Here are some close ups, I forgot to photograph the back so had to do a quick opening up of the wrapping to get a snap before gifting!




Gifts weren't opened at the christening so I don't know how the quilt was received, but I'm glad I made it, she's a lovely little girl (yesterday was the first time I met her) and I hope she enjoys this quilt for years to come.  Now onto the next WIP...


So two down eight to go. My list can be found here: 2015 Finish-Along Quarter 1


Linking up with Adrianne for:

2015 FAL at On the Windy Side

Tuesday, 3 March 2015

So long February Fresh Sewing Day

On Sunday we had a rare day where neither of us had any plans - no work, theatre, Guiding, social, family commitments or anything else we had to do. Part of me saw a day of sewing ahead, but Nick wanted to go to the Spring Gala on the Keighley and Worth Valley Railway, and since he's just spent 2 weeks putting in a huge number of hours at the theatre who was I to argue. It was a lovely but long day and meant no sewing to start the month. I did take my crochet though and ploughed on with that when I could, much to the amusement of some older gentlemen on one of the trains...





Turns out in February I was not only bad at making things I was also bad at taking photos of what I had made so I had to do some snapping last night.

I did make an infinity scarf using some of Katy Jones' Priory Square Knit in Clover. Really nice to wear and got some lovely comments at work wearing it too.




I also finished this quilt top, my Leeds MQG Round Robin round 1 (it's a secret but it's in the bag I promise!) This was my first time foundation paper piecing and I see more in my future for sure.




My sewing at the Leeds MQG February meeting was rather more unplanned than I'd hoped - as in dashing round that morning before driving over to Leeds grabbing stuff from my sewing room - so I didn't achieve anything on my finish-along list. However I took a little pile of hst squares and made them into windmills (I think I'm going to mix these up with some red squares and make into something on my next finish-along list), finished one little dumpling bag that had been half done for over a year and started another.


  

Our March Leeds MQG meeting is all about making more quilts for Siblings Together and I made a start after the last meeting doing lots of fabric cutting using fabrics kindly donated by members. Looking forward to these turning into quilts in a couple of weeks.





I also made 5 blocks for Mary Emmen's quilts for Siblings Together too, I couldn't believe I found 43 different blue/green/grey/black boyish fabrics so easily in my stash - it's lovely to be able to contribute something to a project like this and why I love the online quilting community so much.




Crochet also featured heavily in February, I had to remake my square for The Patchwork Heart's community crochet blanket at Royal Mail delivered an empty envelope the first time.





Then I worked on more and more rounds of my Sophie's Universe Crochet Along I'm a little behind but loving doing something out of my comfort zone and seeing all the different stitches turn into something beautiful.




So that was February - not too shabby as it turns out. This week I need to finally get on with some quilting so I *hope* to have some big finishes to share soon.

Linking up with:

Fresh Sewing Day



Monday, 9 February 2015

Very belated Fresh Sewing Day

Went to blog about my cushion finish this lunchtime to find I never blogged about January last week.

January was a tough month - I was ill for a lot of it, work was very busy - January is always the toughest month but this was particularly tough, Nick went away with work, there was lots going on with theatre and Guiding stuff and consequently my crafting productivity wasn't that great.

It started well - the centre of my Leeds MQG Round Robin Rainbow nested stars, the first thing sewn on my new machine.

I then attempted to finish my Aragon bag - it's finished but the finish is bag so it needs to be unpicked and the lining put in properly rather than just attached to the panels - when I have the time and inclination.

At the Leeds MQG meeting I finished off a cushion from my FAL list which I've just blogged about here

I've also been making progress on my Simply Solids Wonky Stars Quilt - not quite as much as I'd hoped but  it should be done this month (the picture was from the start of the month when I was playing with layout)

I had my first play with foundation paper piecing making the borders for round 1 of the Leeds MQG Round Robin I was inspired by Kelly from Jeliquilts exactly what I've done is a secret though.


I did a fair bit of crochet in the second half of January - after a long days at work flopping on the sofa worked well for me. I made a square for Heather @ ThePatchworkHeart's 1st Community Crochet Project and I started my Dedri @ Look At What I Made's Sophie's Universe CAL - the bottom right photo shows the first 3 parts. I'm going to try hard to keep up with this each week - there are 18 parts in total.  

I thought I hadn't done too much but actually that's not bad. I've taken Friday off as a flexi day this week as I worked so many hours in January so I can hopefully get cracking with some quilting on my new machine.

Belatedly linking up with:

Fresh Sewing Day



A Finish-Along Finish - Floral Cushion

When I got my Sizzix machine in July 2013 I grabbed a pile of matching half yards from my stash and cut some hst pieces.

I was going to give it to my sister in law for her birthday, I did the sewing and quilting pretty quickly, then had binding issues, I remember trying to finish it in the car on the way to Whitby on my wedding anniversary, which is 2 days before my SiL's birthday. Needless to say another gift was found but the cushion was gifted to her and my brother for Christmas that year.

I'd planned to make another one to go with it and by Christmas this second one was pieced and had fusible fleece attached and one single tiny line of quilting of quilting (why?!) but no more.

Last summer when I made my first FAL list I had this is a likely contender but no it sat like this for another six months.

Then I took it to Leeds MQG in January, I managed to find just enough Sketch in grey to take with me to make the backing and I'd already got the binding cut and ready to go. I even remembered I'd used Aurifil 2600 in 40wt for the first one so grabbed that too. I got the quilting done quickly and then got the envelope back cut, bound, attached to the front and the binding attached to the front too whilst in Leeds, and had time to move onto another project too.

Then the next day I sat at home and hand sewed the binding onto the back to match the first one and done. 


That wasn't so hard was it?! It took 3 weeks to put a pillow form in it and another week to blog about it but still...

So one down nine to go. My list can be found here: 2015 Finish-Along Quarter 1


Linking up with Adrianne for:

2015 FAL at On the Windy Side






Wednesday, 7 January 2015

2015 Finish-Along Quarter 1 List


2015 is going to be the year I get through my WIPs, there's so much I want to make and I have plenty of fabric to keep me going but I just can't start new things at the moment without finishing some of these.

I got a new machine at the weekend, a Janome Horizon Memory Craft 8200 QC. I love my Janome DXL603, bought 3 years ago when I wanted to do more sewing. It's made bags, cushions, a few items of clothing, taken up curtains, quilts, travelled all over the country with me and been a brilliant machine but quilting is hard work on it and it's also struggling. So I went into the sewing machine shop in Harrogate to ask about a service for it and came out with my new machine. I had been looking at buying one before Christmas so it wasn't completely spontaneous, they just happened to have one in the shop so I could take it away that day. I'm keeping my trusty DXL603 too, once it's had a service I'm sure it'll be just fine.

So I'm hoping I can get through all my quilts that need quilting fairly quickly now - also the living room floor is pretty clear at the moment so I can get things basted - that's half my battle normally.

My 2015 Finish-Along Quarter 1 list is as follows, obviously including the 7 carry overs from 2014 first:

1. Summer Slice

This quilt, pattern by Cluck Cluck Sew, was started last July for my sister in law's 30th. By the time I'd gathered fabric in the right colour ways I was cutting it fine for her birthday, got the top sewn together in the middle of August and then nothing. No space to baste, took it on holiday but did the smaller two quilts first and ran out of time. I did baste it on the 22nd December in some foolish hope I could quilt it before my sister in law arrived on Boxing Day, but didn't.

So this is number one quilt to quilt on my new machine. I'm going to London in a couple of weeks and hoping I can arrange to meet up with my brother who works in the City and drop it off with him - 6 months late...



2. Splitting Squares Quilt

A straight carry over from the last two lists. Anna at Quilting Along the Grain's  Splitting squares quilt, I won the pattern in a giveaway last summer (2013) and made the top last August (2013), got no further. The sashing is navy, rather than black I promise! 


This just needs basting, quilting, binding and then a home.




3. Posy Baby Quilt

Started in June 2014, borders added in July 2014, has been sat around since then. Another one that just needs basting, quilting, binding. I have a home for this one though. 





4. Disappearing 9 Patch Quilt

Disappearing 9 patch, did these in 2013, never got any further - really should make them into a quilt, I was planning it for Siblings Together so that'll be my motivation to get it done for this summer for that. 



5. Simply Solids Wonky Stars Quilt

In 2013 to compliment their new monthly solid stash club Laura produced a wonky star quilt pattern for Simply Solids one of my favourite fabric shops. I did pretty well keeping up with making the stars until the autumn, then it all went a bit wrong. I finished the rest of the stars in September (I think) 2014 and now I need to make it into a quilt top, baste, quilt, bind etc. I have a recipient for this and it really needs doing in the next few weeks.




6. HST Cushion

Finished one of these for my Brother & his wife for Christmas 2013, didn't realise I hadn't done second. It was my first play with my Sizzix machine in summer 2013. I hoped to get it done and be able to give it to them at Christmas this year but didn't get that far. 






7. Noodlehead divided baskets

I bought the Noodlehead Divided Basket pattern in May 2014. Did the fabric pull, cut most of it out, sewed a tiny bit, then it got forgotten. I didn't sewing in my sewing room again until after Christmas. I got this out once I'd finished the quilt I was working on then, ironed it all, read the instructions again and was obviously a bit optimistic that I'd get up there and be able to do some whilst my in laws were here. Less of a priority this one, it's for me, but it would be nice to finish it and see if it's something I can make for others.



8. Aragon Bag 

My first new addition to the list. I wanted to make a bag for taking bits to Leeds MQG meetings, and for taking sewing supplies on holidays. A decent sized bag with a zip was the requirement and I looked around and found the Aragon Bag by Sew Sweetness - I bought, fabric pulled, and cut out in October and then made some progress at the November Leeds MQG meeting with it. I managed a bit more after that and was then busy every evening for weeks so this got put to one side. The pattern isn't as thorough as Erin @DogUnderMyDesk ones which I'm more used to and I struggled a bit with it. It's further on than in this photo though. 

It's all carefully boxed up having spent weeks in the corner of my sewing room. The plan is to make some drawstring bags and other little sewing bits and pieces in the left over fabric (it's made with fabrics from Riley Blake Designs "Sidewalks" by October Afternoon which I had half yards of from Pink Castle Fabrics stashed away). 




9. Sew Together Bag

When I got back from my holiday in October I decided to make a Sew Together Bag, but decided I wanted it patchwork, because I never take the easy option... So I bought the pattern and got this far. Need to package this up to take with me when I'm out and about and get the hexies finished, then when I've worked through some of my other WIPs I can look at making the actual bag.



10. Star EPP cushion

I started doing this in May 2014, it then got a bit screwed up so I've started again. Most of this was done whilst sitting with family over Christmas and New Year. I'm hoping to get this finished and made into a cushion for a friend's birthday. 





So the plan for January is:

  • Take the HST cushion and the Simply Solids wonky stars to Leeds MQG on Saturday
  • Work on the Aragon bag and the Star EPP cushion at home/out and about
  • Quilt the Summer Slice quilt once I'm happy with my new machine and then hopefully the wonky starts too
  • Forget about the other 5 projects for now!

I'm linking up with Adrianne at On the Windy Side who is kindly hosting the 2015 Finish-Along: 



 2015 FAL at On the Windy Side

Tuesday, 6 January 2015

Finish Along 2014 quarter 4 - final review

Blimey 5th blog post in 2 days but I want to review my finish along list before I start on my next one.

I'm pleased to say that three quilts are now finished:






Apart from basting this quilt just before Christmas, and then deciding that I'd wait until I got a new machine to quilt it as I was a bit worried about my existing machine after having trouble quilting my sparkle punch star quilt (which took 2 1/2 weeks start to finish, with lots of late nights, proving I can do it):


I've not made any progress on my other projects:










So three finished, and 7 to carry over, whilst also making and finishing a quilt start to finish, and a big bag, and a few other bits, not too shabby quarter 4. 

Thanks to Katie at The Littlest Thistle for hosting the Finish Along in 2014 - it got me blogging and motivated to dig out some WIPs and actually finish some projects. 

I'll be back tomorrow with my Finish Along Quarter 1 list for 2015 which Adrianne on the Windy Side  is hosting- I'm hoping to really crack these stubbon WIPs in Quarter 1, get some quilts sent off and then I can move on to new projects.